Infrastructure repairs
Below is a list of requests to Fife Council concerning on-going necesary infrastucture repairs/maintenance. If anyone has anything to add please let us know.
March 2024 Infrastructure items in Elie and Earlsferry pending
Infrastructure items in Elie and Earlsferry pending
First reported |
Description |
Progress reports |
Completed date |
Prehistoric |
Theft of Council table and chairs from Earlsferry Town Hall |
|
Historic |
March 2020 |
Broken Wall at Dome Park |
|
Won’t ever be fixed |
October 2020 |
‘No Waiting’ signs at the bottom of Admiralty should be removed |
|
|
October 2020 |
Bin-store at Ruby Bay requires be repainted or replaced. |
|
|
October 2020 |
Regular flooding is occurring at the bottom of Cadger’s Wynd. |
|
On-going |
October 2020 |
Trees at Toll Green urgently need to be pollarded. Up to 100 rooks causing a certain health hazard. |
|
In hand |
October 2020 |
Boat Wynd - the ground round the manhole cover over the drain on the grass at is sinking, so there must be underlying issues with the drain i.e. leakage etc. In Feb ’22 Angela reported that this has been temporarily filled in with turf, presumably by a concerned resident, but still no action from FC. Cllr Bill Porteous agreed to look into this again. |
|
In hand by builders at Katherine Villa
|
February 2024 |
Two holes in road opposite entrance to drive to Elie House |
Reported to Cllr Sean Dillon |
|
February 2024 |
The pavements on both sides of the road in the Toft require to be repaired |
Reported to Cllr Sean Dillon |
|
February 2024 |
There is a hole in Harbour Road opposite the toilet. |
Reported to Cllr Sean Dillon |
|
February 2024 |
The signs at the bottom of Admiralty Lane are rusted and require to be removed and replaced if required. |
Reported to Cllr Sean Dillon |
|
February 2024 |
A white line and Give Way sign are required at the bottom of School Wynd. |
Reported to Cllr Sean Dillon |
|
February 2024 |
The sand which has built up on South St., Fountain Road and harbour Road requires to be removed. |
Reported to Cllr Sean Dillon |
Completed Feb ‘24 |
February 2024 |
The raised pavement at the bollard in front of the Library is still a trip hazard. |
Reported to Cllr Sean Dillon |
|
February 2024 |
The sign at Cadgers Wynd is facing the wrong way. |
Reported to Cllr Sean Dillon |
|
February 2024 |
There are a number of potholes on Chapel Green Road, which require to be filled in. |
Reported to Cllr Sean Dillon |
|
February 2024 |
There is a broken No Parking sign at Chapel Green which has not as yet been repaired. |
Reported to Cllr Sean Dillon |
|
February 2024 |
The sign at the corner of Earlsferry High St. and Links Road is leaning over at an angle. |
Reported to Cllr Sean Dillon |
|
February 2024 |
There is a leaking Water Main at Ferry Road by the electric substation resulting in water cascading down Ferry Road. |
Reported to Cllr Sean Dillon |
|
February 2024 |
There is a hole in the road at the exit from North St. on to Elie High St. |
Reported to Cllr Sean Dillon |
|
February 2024 |
The bus shelter by the entrance to Elie House drive requires to be refurbished and the broken pane of glass replaced. |
Reported to Cllr Sean Dillon |
Completed Feb 2024 |
February 2024 |
Give way sign at the top of Stenton Row at junction with High Street has disappeared |
Reported to Cllr Sean Dillon |
|
February 2024 |
Short pavement that runs along the front of the play park needs repaired. It is very uneven and crumbling in places |
Reported to Cllr Sean Dillon |
|
February 2024 |
Replace No Entry sign at west end of Earlsferry High Street |
Reported to Cllr Sean Dillon |
|
February 2024 |
Several potholes on road to Elie Harbour |
Reported to Cllr Sean Dillon |
|
March 2024 |
Pavement on east side of Park Place has disintegrated and needs resurfacing |
Reported to Cllr Sean Dillon |
|
March 2024 |
Request for signage both ways at bridge near entry to Elie Caravan Park and possible priority one way sign. |
Reported to Cllr Sean Dillon |
|
March 2024 |
Request for street lighting on The Vennel and Fountain Road. Previously, when lights were brighter existing lighting was sufficient – not any more. |
Reported to Cllr Sean Dillon |
|
March 2024 |
Boat Wynd – entry steps to beach have been seriously damaged in recent storms |
|
|
March 2024 |
Castwell Road Sign round the wrong way |
|
|
April 2024 |
Flooding from electric substation on Ferry Road.
It is understood that Kelburn Construction have been appointed by Scottish Power as contractors to fix the problem. This is major work and they estimate it will take 2 weeks.
|
Cllr Alycia is investigating why we are still waiting |
|